+7(7252)
321-275
Personal
cabinet
Type:
Ind.number:
Password:

Voting

Where you learned about our site?
Search systems
34.9%
By the advice of friends, acquaintances
18.2%
The message on the account notice
19.2%
Mass media
13.0%
Another
14.1%
votes: 3307
archive questions

PROCEDURE OF CONNECTING TO WATER SUPPLY AND SEWAGE NETWORK

ORDER OF DELIVERY OF SPECIFICATIONS ON CONNECTION TO SYSTEM OF THE CITY WATER SUPPLY SYSTEM (SEWERAGE) AND CONNECTION OF OBJECT

For physical persons (population).

1. For receiving preliminary specifications for design and building of objects of systems of a water supply system and/or the sewerage it is necessary:

1.1. To fill in the Statement (sample 1)

1.2. To attach the following documents to the statement:

1. Situational scheme (topographical survey 1:2000). Given by the specialized organization having the corresponding license.

2. The plan of a site and adjacent territories (topographical survey 1:500) with causing connected object, and also engineering communications, buildings and constructions. Given by the specialized organization having the corresponding license.

3. The reference permission from the third owner on connection to a network (in case there is a network of the third owner between a network of the connected subscriber and the VKH network).

4. The document certifying the right of the owner on object. (copy of state act, technical data sheet, purchase and sale contract, identity card)

5. Calculation of water consumption, water disposal in compliance with a capacity and purpose of object (for objects with a diameter of section of a pipe over 15 mm). Made by the specialized organization having the corresponding license.

6. The conclusion for delivery of specifications on connection to a water supply, sewer system from the organization which is carrying out operation of a network:

  • Enbekshi region, Valikhanov Street, 188а, tel. 576665
  • Al-Farabi region, Kurnakov Street, w/n , tel. 530956
  • Abay region, Kaldayakov Street, 9, tel. 562492
  • Voroshilovka village, Chapayevka, Lenger high road, w/n , tel. 276531
  • Kaitpas village – Baidibek bi Street, w/n (near to fuel filling station), tel. 476182
  • Kyzyl-Sai village, Tauke-Khan Street, 22, tel. 554265
  • Region of Svintsoviy village, Gagarin Street, w/n (near to SMU-4), tel. 541258.

Note: Without the appendix of the specified documents the enterprise has no opportunity to accept your statement and to prepare preliminary specifications for design and building of objects of systems of a water supply system and/or the sewerage.

2.For obtaining permission to connection to networks of a water supply system and/or the sewerage it is necessary:

2.1.To fill in the Statement (sample 2)

2.2.To attach the following documents to the statement:

  1. The project on construction of networks and constructions for joining to system of water supply, the sewerage.
  2. The executive scheme in the plan and a section (scale 1:500) of new laid water supply, sewer systems.
  3. The act for the hidden works, signed by representatives of the customer, the Contractor and Vodnye resursy-Marketing LLP.
  4. The act on hydraulic tests of the water, sewer systems, signed by representatives of the customer, the Contractor and Vodnye resursy-Marketing LLP.
  5. The certificate of quality of the materials used at building of objects.
  6. The act of acceptance of the performed works on the finished building of object.
  7. The contract for works with the contract organization having the corresponding license.
  8. The act of washing and disinfection of the water, sewer systems, signed by representatives of the customer, the Contractor and Vodnye resursy-Marketing LLP.
  9. The reference confirming drawing on a tablet of the city of again constructed water, sewer systems. Given by city architecture (Turkestanskaya Street 11).
  10. The act on installation and seal of the metering device of water. Given by the water-measuring workshop. Teriskey Street w/n, tel. 527157, 528274.
  11. The contract for service on water supply and/or removal of sewage. Tel. 321190 (ext. 225,226). Given by department of working with population, Vodnye resursy-Marketing LLP, off. 103, 104, 111.

Note: Without the appendix of the specified documents the enterprise has no opportunity to accept your statement and to prepare specifications on connection to system of a city water supply system and/or the sewerage.

Download the samples of applications

 

For enterprises and organizations

1. For receiving preliminary specifications for design and building of objects of systems of a water supply system and/or the sewerage it is necessary:

1.1.To fill in the Statement (sample 3)

1.2.To attach the following documents to the statement

  1. Situational scheme (topographical survey 1:2000). Given by the specialized organization having the corresponding license.
  2. The plan of a site and adjacent territories (topographical survey 1:500) with causing connected object, and also engineering communications, buildings and constructions. Given by the specialized organization having the corresponding license.
  3. The reference permission from the third owner on connection to a network (in case there is a network of the third owner between a network of the connected subscriber and the VKH network).
  4. The document certifying the right of the owner on object (the copy state act, technical data sheet, purchase and sale contract, identity card)
  5. Calculation of water consumption, water disposal in compliance with a capacity and purpose of object (for objects with a diameter of section of a pipe over 15 mm). Made by the specialized organization having the corresponding license.
  6. The conclusion about delivery of specifications on connection to a water supply, sewer system from the organization which is carrying out operation of a network:
  • Enbekshi region, Valikhanov Street, 188а, tel. 576665
  • Al-Farabi region, Kurnakov Street, w/n , tel. 530956
  • Abay region, Kaldayakov Street, 9, tel. 562492
  • Voroshilovka village, Chapayevka, Lenger high road, w/n , tel. 276531
  • Kaitpas village – Baidibek bi Street, w/n (near to fuel filling station), tel. 476182
  • Kyzyl-Sai village, Tauke-Khan Street, 22, tel. 554265
  • Region of Svintsoviy village, Gagarin Street, w/n (near to SMU-4), tel. 541258.

Note: Without the appendix of the specified documents the enterprise has no opportunity to accept your statement and to prepare specifications on connection to system of a city water supply system and/or the sewerage.

2. For obtaining permission to connection to networks of a water supply system and/or the sewerage it is necessary:

2.1. To fill in the Statement (sample 4)

2.2. To attach the following documents to the statement

  1. The project on construction of networks and constructions for joining to system of water supply, the sewerage.
  2. The executive scheme in the plan and a section (scale 1:500) of newly laid water supply, sewer systems.
  3. The act for the hidden works, signed by representatives of the customer, the Contractor and Vodnye resursy-Marketing LLP.
  4. The act on hydraulic tests of the water, sewer systems, signed by representatives of the customer, the Contractor and Vodnye resursy-Marketing LLP.
  5. The certificate of quality of the materials used at building of objects.
  6. The act of test of fire hydrants on serviceability and water return (in case of installation of fire hydrants), signed by representatives of the Contractor and fire inspection.
  7. The act of acceptance of the performed works on the finished building of object.
  8. The contract for works with the contract organization having the corresponding license.
  9. The act of washing and disinfection of the water, sewer systems, signed by representatives of the customer, the Contractor and Vodnye resursy-Marketing LLP.
  10. The reference confirming drawing on a tablet of the city of again constructed water, sewer systems. Given city architecture (Turkestanskaya Street, 11).
  11. The act of differentiation of balance accessory and operational responsibility between the consumer and water supplying organization. Tel. 32-11-90 (ext. 118, 129, 130). Given by department of working with legal entities and individual entrepreneurs of Vodnye resursy-Marketing LLP, off. 315, 316, 317.
  12. The conclusion on connection to networks of water supply, the sewerage. Is given by technological department of Vodnye resursy-Marketing LLP (off. 211), approved by the chief engineer (off. 100).
  13. The act on connection of again constructed water supply, sewer system of the customer to the VKH network. Given by technological department of Vodnye resursy-Marketing LLP, каб.211.
  14. The act on installation and seal of the metering device of water. Given by the water-measuring workshop. Teriskey Strret, tel. 527157, 528274.
  15. The contract for service on water supply and/or removal of sewage. Is given by department of marketing of work with legal entities and individual entrepreneurs of Vodnye resursy-Marketing LLP, off. 315,316,317, tel. 32-11-90 (ext. 118, 129, 130).

Note: Without the appendix of the specified documents the enterprise has no opportunity to accept your statement and to prepare specifications on connection to system of a city water supply system and/or the sewerage.

For the help in registration and preparation of the documents attached to applications for delivery of specifications, you can apply to technological department (off. 211) tel. 32-11-90 (ext. 121).

Download the samples of applications

Яндекс.Метрика
Our
contacts
"Vodnye resursy-Marketing" LLP
Address: 17 Ormanov Street, Shymkent

Shymkent code: 8(7252)
Reception office 321-195, 321-194, 326-009
Central Dispatch Service: 321-274, 323-574
Hot-line: 321-275
Inspection of population water balance: 321-180
Water measuring workshop: 373-362, 375-457
Fax: 322-544
E-mail: info@wrm.kz
About company  |  Reports  |  Consumer  |  Purchases  |  Partners  |  Archive  |  Contacts
© All rights of "Vodnye resursy-Marketing" LLP are reserved
Design and development of "LiO Programs"LLP 2013